Factory and quality evidence

Factory, Quality Control and Export Packing

Review MobileX POD’s China office pod factory support, quality-control process, applicable certificate documents and export packing evidence before requesting project materials.

Office Pod Factory Capability

Current public factory information for early supplier verification. Project-specific capacity and schedule should be reconfirmed before order approval.

Factory location

Factory, office and showroom operations are based at No. 22 Yuhe Road, Dongshan Village, Qishi Town, Dongguan, Guangdong, China, with export and project coordination through Shenzhen.

Approximate capacity

Approximately 300 units per month is the current reference figure, subject to model mix, customization and production load.

Production processes

Publicly described processes include laser cutting, CNC bending and powder coating, followed by assembly, electrical checks and final inspection.

Quality Control Process

Quality checks are organized around materials, production, electrical functions and final handover.

Incoming material inspection

Check incoming frame, panels, glass, acoustic materials and selected electrical components against the approved specification.

Production and finish inspection

Review dimensions, alignment, surface finish, door operation, glass installation and visible workmanship during production.

Electrical and final checks

Verify agreed lighting, ventilation, socket and voltage functions, then complete final inspection and packing checks before shipment.

Certificates and Compliance Documents

Certificate evidence is model- and project-specific and must be checked against the exact order scope.

ISO 9001:2015

Current page materials identify ISO 9001:2015 quality-management documentation. Buyers should request the applicable current file for their project.

MobileX POD ISO 9001:2015 certificate document

CE documentation for selected office pod models

CE documentation is available for selected office pod models when applicable. It must not be read as universal CE certification for every product or model.

MobileX POD CE documentation for selected office pod models

Export Packing and Loading

Use the visual references as a starting point, then request current order-specific packing and loading evidence.

MobileX office pod factory assembly line reference

Assembly reference

Production-line visual for office pod and meeting booth manufacturing discussion.

MobileX office pod door and glass inspection reference

Door and glass inspection

Inspection visual for door, glass and finished-booth review.

MobileX office pod close quality inspection reference

Close QC inspection

Close inspection visual for finish, branding and quality questions.

MobileX office pod export packing reference

Export packing

Export packing visual for crate and loading preparation.

MobileX office pod export wooden crates reference

Wooden crates

Reference image for export crate preparation.

MobileX office pod container loading reference

Container loading

Container-loading reference for export planning.

What the Published Factory Records Show

For a standard pod, compare the model configuration and the checks relevant to that configuration. For a custom shell, look at how an approved design becomes manufactured panels, openings and assemblies. MobileX’s published records give buyers concrete examples of both manufacturing work and shipment preparation.

A custom shell manufactured from a customer-approved model

The Japan-bound custom shell record follows a customer-approved STEP/CAD model into shell manufacturing, factory assembly and protective packaging. MobileX’s work included the structural frame, exterior panels, entrance assembly and specified cutouts and mounting provisions. Electrical, ventilation, fire-safety systems and interior fit-out were assigned to the local project scope for separate completion in Japan.

This is useful when a project contractor already has local equipment or specialist installers: the enclosure can be reviewed around the required physical interfaces, with factory work and local work identified before fabrication. The record shows that division of work in one project; it is not a claim that the unfinished shell was already a commissioned room.

Choose the record that answers the purchasing question

Can the manufacturer discuss the assembly, not just the finished appearance?
The factory assembly article explains visible shell and entrance details in its own photographs. Use these views to discuss component relationships and the information an installation team needs.
What does packing preparation look like?
The packing and installation preparation guide shows closed wooden crates with raised bases and exterior labels, plus a separate container-loading view with securing straps. These details help the receiving team discuss identification, unloading and handling.
Which evidence should accompany my quotation?
For a standard model, keep its configuration list and applicable model documents with the quote. For a custom shell, add the approved design reference and the schedule of openings, mounting provisions and factory-versus-local work. Use shipment-specific packing records for the final receiving plan.

The linked records are separate examples, not one continuous order history. Acoustic results and applicable certificate documents remain tied to their stated models and test or document scope. Send the model or custom design and the decision your team needs to make through the factory-document request.

Factory Verification Checklist for Buyers

Before payment or final approval, buyers can request current evidence that matches the exact order.

Request these materials

  • Current factory video or live video call.
  • Drawings and model specifications.
  • Certificate files applicable to the selected series.
  • Production, QC, packing and loading photos.
  • Order-specific confirmation before shipment.

Check the project scope

  • Product model, quantity and destination country.
  • Socket, voltage and agreed functional scope.
  • Unloading, access and installation requirements.
  • Applicable local building, electrical and accessibility requirements.

Frequently Asked Questions

Short answers for buyers checking factory and compliance evidence.

Where is the factory support located?

Factory, office and showroom operations are based at No. 22 Yuhe Road, Dongshan Village, Qishi Town, Dongguan, Guangdong, China, with export and project coordination through Shenzhen.

What quality checks are performed?

Checks cover incoming materials, production and finish, electrical functions and final packing inspection.

Do all models have CE documentation?

No. CE documentation is for selected office pod models when applicable and must be checked against the exact model and project.

How are office pods packed for export?

Buyers can review export crate and container-loading references and should request current order-specific packing details before shipment.

What can buyers request before ordering?

Buyers can request current drawings, model specifications, applicable certificate files, production and QC photos, packing references and project-specific confirmation materials.

Request Factory and Compliance Documents

Send the model, quantity, destination country and the documents your project team needs. MobileX POD will confirm which current files and project-specific materials are available.