Can a Lactation Pod Have a Sink Without Building Plumbing?

Yes. MobileX can build one custom nursing pod with a fresh-water tank to supply the tap and a separate wastewater tank to collect the basin discharge. If the proposed location has no water or drain connection, facilities staff need somewhere to refill the supply and empty the wastewater tank.

Watch the sink in use

14-second factory video. The tap runs, the cabinet opens, and the panel shows the fresh-water and wastewater level indicators.
Cabinet close-up with a handled blue water container and tubing beneath the sink.
Factory close-up: a handled container and tubing below the basin. When reviewing the layout, ask how the cabinet opens and how staff reach the container with the nursing chair in its usual position.

Will the sink last until the next service visit?

Illustrative office example. Suppose the sink is used eight times between visits. Facilities measures 1.5 litres per use on a comparable tap. Expected demand: 8 uses × 1.5 litres = 12 litres. For this estimate, assume the full 12 litres drain into the wastewater tank.

If 15 litres of fresh water are available but the wastewater tank has only 10 litres of free capacity, the supply side has 3 litres to spare (15 − 12), but the collection side is 2 litres short (12 − 10). At this rate, six uses send 9 litres to the tank; a seventh would bring it to 10.5 litres. Service it before the seventh use, sooner if staff need a reserve, or request more usable collection capacity. For your site, compare use between staff rounds with both the fresh water actually available and the free space left in the wastewater tank, after allowing for your reserve. The side that reaches its limit first sets the interval. These example figures are not tank ratings or a promised number of uses; confirm both capacities for the quoted configuration.

What should the supplier quote?

The compact pod starts at USD 4,500 EXW and includes a sink. The sink inclusion alone does not establish the price of a tank-fed configuration. For a tank-fed installation, request separate lines for the fresh-water tank, wastewater tank and pump, plus a drawing of the cabinet opening and service space.

Please quote a lactation pod with a fresh-water tank and a separate wastewater tank. At the proposed location we have [power / water / drain]. We expect [uses] between service visits at [litres per use]. Please list the fresh-water tank, wastewater tank and pump in the quote. Confirm the usable capacity of each tank, how staff refill and empty it, and what site work is separate. Please show the cabinet opening and service clearance on the layout drawing.

Request a project quote