DDP Office Pod Delivery to USA: What Buyers Should Confirm Before Ordering
A MobileX office pod costs USD 1,380–3,650 EXW at July 2026 reference prices. Delivered to a US building with customs clearance and import duties included, an MP1 comes to about USD 2,100 and an MP3 to about USD 4,900–5,000, using November 2026 consolidated sea-freight rates. Moving the pod upstairs, assembly and any site electrical work are added locally.
For a useful office pod cost comparison, follow the goods from the factory to their working position. The key is to count each cost once and compare the same model, furniture and delivery endpoint.
Start with the pod and its packed weight
Choose the workspace first. MP1 and MP1+ serve one person; MP2 serves two; MP3 serves up to four in a shared meeting space. The office phone booth range and meeting pod range show the model choices.
| Model | Exterior W × D × H | July 2026 EXW reference | Gross weight, including packaging | Reference packed volume |
|---|---|---|---|---|
| MP1 | 1000 × 1000 × 2200 mm | USD 1,380 | 360 kg | 2.0 m³ |
| MP1+ | 1200 × 1200 × 2200 mm | USD 1,650 | 410 kg | 2.5 m³ |
| MP2 | 2000 × 1000 × 2200 mm | USD 2,380 | 520 kg | 4.0 m³ |
| MP3 | 2000 × 1600 × 2200 mm | USD 3,650 | 650 kg | 4.0 m³ |
MP1 and MP1+ include a desk and seat. MP2 and MP3 seating-and-table sets are separate quotation items. Use the accepted furniture and electrical choices when comparing totals; the figures below keep those optional additions separate.
US orders use 110–120V and the agreed US socket arrangement. Share the devices you intend to power and have the destination’s electrical and building requirements reviewed for the installation. For interior sizes and the route into the room, see the dimensions guide.
What does the November 2026 consolidated rate include?
In November 2026, a consolidated sea-freight rate to the US West Coast was about RMB 14 per kg of packed weight for a knocked-down pod. It covered export and import customs clearance and import duties, with delivery to ground level at the building; carrying the pod upstairs or into the room is not included. The East Coast reference was about RMB 13/kg on the same basis.
These are November 2026 reference rates, charged on the actual packed weight of a disassembled shipment. Freight changes with the route, address, shipment and booking date, so the final quotation sets the current amount and named receiving point. Confirm the unloading arrangement and access restrictions with the delivery booking.
For a pod shipped fully assembled, freight is charged by volume. Ask us for an assembled-shipping quote.

Single-pod shipping calculations
Illustrative calculations: standard packed weights × the November reference rate. For comparison in US dollars, the Bank of China conversion reference published on 3 November 2026 at 09:39:17 was RMB 671.50 per USD 100: USD 1 = RMB 6.7150. USD amounts below equal RMB ÷ 6.7150, rounded to the nearest dollar; payment conversion uses the actual settlement rate.
| Model | West Coast: weight × RMB 14/kg | Approx. USD | East Coast: weight × RMB 13/kg | Approx. USD |
|---|---|---|---|---|
| MP1 | 360 × 14 = RMB 5,040 | 751 | 360 × 13 = RMB 4,680 | 697 |
| MP2 | 520 × 14 = RMB 7,280 | 1,084 | 520 × 13 = RMB 6,760 | 1,007 |
| MP3 | 650 × 14 = RMB 9,100 | 1,355 | 650 × 13 = RMB 8,450 | 1,258 |
For example, MP1 West Coast freight is RMB 5,040 ÷ 6.7150 = about USD 751. MP2 East Coast freight is RMB 6,760 ÷ 6.7150 = about USD 1,007. Both estimates include the stated clearance, import duties and ground-level delivery scope.
Product plus delivery: the subtotal before site work
The next table combines the dated product reference with the shipping estimate. These illustrative subtotals help you compare options; they are not current quotations.
| Model | West Coast product + delivery | East Coast product + delivery |
|---|---|---|
| MP1 | USD 1,380 + 751 = USD 2,131 | USD 1,380 + 697 = USD 2,077 |
| MP2 | USD 2,380 + 1,084 = USD 3,464 | USD 2,380 + 1,007 = USD 3,387 |
| MP3 | USD 3,650 + 1,355 = USD 5,005 | USD 3,650 + 1,258 = USD 4,908 |
Add the selected furniture or custom options, buyer-arranged movement and assembly to reach your project total. Where a service is unquoted, leave an open budget line. That is more useful than silently entering zero.
The two coasts’ rates describe different shipping routes. Choose the route for your actual address and service scope rather than sending goods to the other coast just to obtain the lower per-kilogram figure.
When does a full container make sense?
A 40HQ can carry 33 MP1 pods, 15 MP2 pods or 15 MP3 pods, using the confirmed disassembled packing arrangements. These are single-model loading references. A mixed-model load needs its own loading plan; the MP1+ count is confirmed with the quote.
| Single-model 40HQ load | Units | Freight allocation per pod |
|---|---|---|
| MP1 | 33 | Quoted container freight ÷ 33 |
| MP2 | 15 | Quoted container freight ÷ 15 |
| MP3 | 15 | Quoted container freight ÷ 15 |
Ask us for the current 40HQ rate to your port. Keep its currency and endpoint beside the number. A port-only container quote needs import and onward-delivery charges added before comparison with the tax-included consolidated rate above.
For a partially filled container, divide by the number you actually buy. Illustrative allocation: if your order contains ten MP2 pods, the container-freight share is F ÷ 10, where F is the actual container freight, rather than F ÷ 15. Fifteen is the loading reference, not the number being invoiced in that example.

Ask for both consolidated and container offers when the order is large enough to make either practical. Compare them through the same named destination and against the dates you need the pods. The LCL, FCL and combined-order guide explains when to combine orders and when earlier units should ship separately.
Where do import duties enter the budget?
The consolidated reference above already includes import duties. Count that included amount once. For a container booking or an EXW, FOB or CIF purchase, identify the import charges separately unless the accepted DDP quotation includes them.
Duty treatment depends on the goods’ classification and the policy in force when they enter the United States. Give the appointed customs professional the actual product description, materials, model, invoice and shipment details. This guide uses no assumed tariff percentage.
For DDP, identify the importer of record and customs representative alongside the receiving contact. The person accepting the crates at an office can have a different role from the party named on the import documents. Record the actual arrangement for the order.
If an offer calls itself DDP while assigning import clearance and duties to the buyer, resolve that mismatch before paying. Agree a trade term and responsibilities that match the transaction. The China factory buying guide compares the main trade-term boundaries and the supplier checks behind them.
What remains after delivery to the building?
Arrange the journey from the receiving point to the installation position. It can include a lift reservation, suitable handling equipment, a local moving team and protection for floors and doorways. The available lift, its load limit and the largest package all matter.
MobileX standard pods assemble from six main panels, with twelve connecting screws, in about one hour using video guidance. Schedule unpacking and inside movement separately. Use the pod relocation guide to plan restricted routes and the dimensions guide to check clearances.

Your local budget should name the person or company handling each remaining job:
- Receiving and the agreed unloading method.
- Upstairs or lift movement and placement inside the room.
- Assembly, operating checks and removal of packaging.
- Any required building-side electrical work.
Illustrative project formula: MP1 West Coast product-and-delivery subtotal USD 2,131 + selected options + receiving/site handling + inside movement + assembly + required electrical work = project total. Enter actual local quotes for the remaining terms; keep included work out of the added lines.
If your staff can complete assembly with the video, budget their time. If a local contractor will do it, compare a written assembly scope. MobileX’s remote guidance and the contractor’s on-site work are separate services.
How can two delivered quotes be compared fairly?
Use one model, one configuration and one destination point. Then check the handover rather than just the headline office booth price.
Illustrative comparison: Offer A ends at the building’s ground level. Offer B also includes upstairs movement and assembly. Compare A + the local movement and assembly quotes with B, keeping furniture and electrical choices identical. A lower headline price can still be the right purchase when your own team already covers the remaining work.
Keep the supplier’s approved packing list with the delivery booking. At arrival, count packages and photograph condition before unpacking, then report discrepancies through the agreed process. The factory buying guide explains how dispatch records connect to those receiving checks.
Comfort is part of the final result too. Use the ventilation guide to choose a suitable room and operating arrangement before paying to move a heavy pod into position.
Frequently asked questions
How much does an office pod cost delivered to the US?
About USD 2,077–2,131 for an MP1 and USD 4,908–5,005 for an MP3, using July 2026 EXW prices and November 2026 consolidated freight with import duties included to ground level. Upstairs movement and assembly are extra.
How much does an office pod cost before shipping?
USD 1,380–3,650 for the four standard MobileX models at July 2026 EXW reference prices. Selected furniture, custom options and the current quotation determine the order price.
Does the November consolidated rate include import duties?
Yes. The stated reference includes export and import clearance, import duties and delivery to ground level at the building.
Does that price include taking the pod upstairs?
No. Upstairs and inside-room movement are arranged by the buyer or a local mover.
How many pods fit in a 40HQ?
33 MP1 pods, or 15 MP2 pods, or 15 MP3 pods with the confirmed disassembled packing. Obtain a loading plan for a mixed order or MP1+ shipment.
Is assembled shipping charged at RMB 14 or 13 per kilogram?
No. Assembled shipping is charged by volume and needs its own quotation.
What should I send for a current US delivered quote?
Send the model, quantity, furniture choices, address and ZIP code, electrical requirements and intended receiving point. Include lift or access restrictions and the date you need the pods.
Get a quote for the same scope you have budgeted
Send those details through the project inquiry form. Choose a product-and-delivery scope your local team can complete, with a named handover point and current freight price. If you are still deciding between an enclosed room and a booth for occasional calls, start with what is an office pod.