Adding a Privacy Pod on Campus: A Facilities Review Checklist for Departments

Before asking facilities to review another pod, prepare three attachments: a marked floor plan, a short use record for each proposed unit, and a manufacturer’s sheet for the exact model under consideration. Give each pod its own ID and use that ID on the floor plan, use record and manufacturer’s sheet. Show what is already in the room as well as what you want to add.

At the University of Illinois Urbana-Champaign, the Facilities & Services Interior Design Pod Review form separates the department’s submission from the facilities team’s site review. Illinois requires approval before procurement or installation. Elsewhere, start by asking your own facilities office which form to use, who can authorize the project, and when that approval is needed.

What goes in the submission?

  1. Cover note: identify the room and the person who can open it. Give the building name and number, floor, room numbers, department, project lead, contact details and date. State whether the request adds units to an existing installation, replaces a unit, or puts pods in a new room. Use filenames with matching dates or revision numbers.
  2. Attachment A: mark the proposed locations to approximate scale. Start with a current floor plan, not a photo of an empty corner. Outline existing pods with one line style and proposed footprints with another. Label the additions P1, P2 and so on. Show each entrance facing the intended direction; mark nearby doors, fixed furniture and the route past the booths. Distinguish measured dimensions from estimates. If a ceiling service or alarm location is uncertain, mark it “verify on site” rather than guessing.
  3. Attachment B: describe what happens inside each unit. For each ID, give the activity, the number of people physically inside and the expected time per session. “P1: one student attending a remote interview, usually 45 minutes, up to 90” tells reviewers more than “interview space, open all day.” A recruiter on screen is not another occupant. For a shared booth, give the intended maximum group size as well as typical use.
  4. Attachment C: request a dimensioned sheet for the proposed configuration. Ask the manufacturer for the model name, drawing number or issue date, exterior width, depth and height, and the door dimensions and opening direction. Ask it to label the finished clear opening separately from the nominal door size. If the proposal adds casters, changes the door or substitutes furniture, identify that version on the plan. A family brochure or an exterior rendering alone will not tell facilities which version fits.

Which decision belongs to campus facilities?

The department supplies the proposed location, use and equipment information. Facilities decides whether the room can take that installation, what evidence it needs, and whether the project needs building work or a different position. An identical pod approved elsewhere on campus is useful background, not approval for this room.

At Illinois, the staff portion of the form addresses escape routes and door hardware, accessibility, emergency signals, sprinkler coverage, electrical provisions and any required anchoring. Its reviewers also check equipment documentation. For an addition, flag the full row of booths: the question is how the room works with all units in place. Leave approval boxes for the responsible campus staff. Ask who will review access and life safety locally rather than transferring an Illinois requirement to your campus or treating a manufacturer’s drawing as sign-off.

At the site visit, keep a short list of open items with an owner: “Supplier to identify door hardware on drawing P2”; “Facilities to verify the revised location against the room’s fire protection.” If the location or model changes, update the affected attachment and its revision before asking for a decision.

A filled example: adding a booth to a career center

Illustrative department submission. The room, use pattern and plan revision below are hypothetical; no campus approval is implied.

Project and plan
Career Services, East Hall, Level 1, Room 114. Plan EH-114, rev B. E1 is the existing booth and stays in place. Dashed outline P1 is the proposed addition opposite the advising desk, with its entrance facing the room. The plan shows the route between both booths and the corridor door.
Use record P1
One student per session for a video interview. Typical booking: 45 minutes; longest expected: 90 minutes. The student brings a laptop and headset. One desk and one seat are required.
Manufacturer attachment P1
Shortlisted model: MobileX MP1+, standard fixed-base configuration. Exterior: 1,200 mm wide × 1,200 mm deep × 2,200 mm high. Label those figures “exterior” on the plan. Request the matching issued drawing with the door swing and finished clear opening; mark that attachment pending until received.
Review requested
Can P1 occupy the marked location alongside E1? Campus facilities to review the route, power and fire protection on site and identify any access review needed. Department lead to return the revised plan if P1 must move. Status: proposed, not approved for purchase.

When you request comparable prices, include the room number, each proposed pod’s ID and the relevant drawing revision in your university acoustic pod RFQ.