One nursing pod brief for European and UK sites
A museum in a listed building and an airport beyond security can use the same furniture schedule. Their power fittings, water service route and receiving arrangements belong on separate site sheets. MobileX manufactures in Dongguan and quotes each European destination by port or postcode.
Projet en France ? Consulter les prix et les critères français →
What can stay the same across the rollout?
Use a common room schedule for procurement and a one-page local appendix for every building. Ask for one fully configured pilot unit (MOQ 1) before repeating the order across offices, shopping centres or stations.
Scroll the table sideways →| Site decision | Shared factory specification | Local sign-off before repeat orders |
|---|---|---|
| Seat and footprint | Compact 1.20 × 1.50 × 2.20 m; Large 2.75 × 1.35 × 2.40 m, external reference sizes. | Measure the furnished clear space for a pram or companion and the approach from the public circulation route. |
| Power at the chair | Specify a 220–240 V, 50 Hz configuration with the outlet accessible from the seat. | France generally specifies Type E; Germany uses Type F; the UK uses Type G. Record the actual building socket and earthing arrangement. |
| Water in a retrofit | Choose a plumbed sink or separate fresh- and wastewater tanks. | For a museum, agree the service sink route; for an airport, agree who can enter the secured area to refill and empty the tanks. |
| Delivery budget | Ask for the finished drawing, packing schedule and the unit price in USD EXW. | Name the country, delivery postcode and receiving hours; a UK delivery and an EU delivery need separate customs quotes. |
For France, the 27 November 2026 estimate used a 2.75 × 1.80 × 2.20 m custom unit and approximately 7 m³ for freight: USD 5,800 EXW + USD 2,820 duty-paid door delivery = USD 8,620 DDP. Unloading, indoor movement, assembly and utility connections are separate. Requote the actual destination; use the example to check the scope of competing budgets.
Workplace rest and a public feeding room are different briefs
EU Workplace Directive 89/654/EEC, Annex I §17 and Annex II §12, requires suitable conditions for pregnant women and nursing mothers to lie down and rest. In Great Britain, HSE asks employers to provide a suitable rest area; its guidance also covers privacy and hygiene for expressing milk. A chair, pump socket and basin answer the expressing brief. The employer should identify separately where a worker can lie down when required.
For a station, shopping centre or museum, agree visitor access with the operator. Check the route with a pram, usable doorway width and emergency access. For an office, also confirm how an employee on a late shift obtains the key. Record these as individual site acceptance items.

Choose the port that fits the receiving plan
Ask for CIF Rotterdam, Hamburg or Antwerp for an EU-bound sea shipment, or CIF Felixstowe for a UK-bound shipment. Under CIF, the seller arranges freight and insurance to the named port; risk transfers when the goods are loaded aboard at origin. The buyer arranges import clearance and the inland leg.
For a DDP comparison, give the exact receiving address and the vehicle restrictions. A city-centre venue can have a delivery slot but no unloading crew. Put unloading, indoor carry, assembly and utility connections on named lines in the purchase order. Use the European office pod delivery page if both product families share a shipment.
Match each report to the item being approved
SGS AJFS2102001269FF_CN records B1 (B – s1, d0) under GB 8624-2012 for the tested polyester acoustic panel. CTTC BA19001740-2 records formaldehyde as not detected for the tested sample. SGS SZXEC1801551601 addresses the coating powder against the RoHS substance restrictions amended by (EU) 2015/863. A European specifier requesting an EN classification should identify the required test on the finish schedule.
Use the component evidence cards with the manufacturer’s dimensional data. The nursing pod range shows the furniture choices; the self-contained sink guide shows how the two-tank option works.
Procurement questions
Can we trial one nursing pod before a multi-country rollout?
Yes. MOQ is one standard unit. Sign off the seating, entry, socket and water service on that pilot, then issue an electrical and delivery appendix for each repeat site.
Can the same electrical specification go to France and Britain?
Specify the shared 50 Hz supply range, then select Type E for the French site and Type G for the UK site. Confirm the building supply and plug schedule before production.
What does the USD 8,620 figure cover?
It is the 27 November 2026 budget for one custom-size pod delivered duty paid to the French destination. Unloading, indoor assembly and connections are separate. A different postcode needs a fresh freight and tax calculation.
Can a tenant order a room without opening a heritage floor?
A separate fresh tank and waste tank serve the basin without a new floor drain. Check tank access, the approved place to empty wastewater and the walking route before fixing the position.
Which documents should a European facilities team request?
Request the model drawing, electrical schedule, component report identifiers and packing list. Tell us which local fire classification the building reviewer requires so the materials can be checked against the correct method.
Sources checked on 28 November 2026
EU Council Directive 89/654/EEC, Annex I §17 and Annex II §12. Great Britain: Health and Safety Executive, Rest and breastfeeding at work.
ICC, Incoterms® 2020 CIF and DDP. MobileX France budget dated 27 November 2026; factory model data and component reports.
- Council Directive 89/654/EEC · Annex I §17 and Annex II §12
https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A31989L0654 - HSE · Rest and breastfeeding at work (Great Britain)
https://www.hse.gov.uk/mothers/employer/rest-breastfeeding-at-work.htm